Os 7 desperdícios do Lean Manufacturing

Manostaxx

The text that follows is owned by the site above referred.

Here is only a small part of the article, for more please follow the link

SOURCE:http://leanmanufacturingtools.org/77/the-seven-wastes-7-mudas/

Os 7 desperdícios do Lean Manufacturing são:

  • Transporte
  • Inventario
  • Movimento
  • Espera
  • Reprocessamento
  • Excesso de produção
  • Defeitos

7-wastes2Transportation1Inventory-Sea1motion-photo1Waiting1Overproduction1over-processing1Defect-Iceberg

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s